Select a Section

News & Updates All »

NO INTERURBAN TROLLEY SERVICE ON THANKSGIVING DAY THURSDAY, NOVEMBER 23, 2017

Tuesday, November 21, 2017

The Interurban Trolley fixed route service and the Interurban Trolley ADA Access service will not operate in Elkhart or Goshen on Thursday, November 23, 2017, due to the Thanksgiving Day holiday. Regular service will resume on Friday, November 24, 2017. In addition, the ADA Access Dispatch... more

INTERURBAN TROLLEY SPONSORS TWELFTH ANNUAL FOOD DRIVE

Tuesday, November 21, 2017

The Interurban Trolley will sponsor its 12th annual “Can Do!” food drive beginning Monday, December 4, 2017, through Saturday, December 16, 2017, to benefit The Window in Goshen and Faith Mission of Elkhart. Containers will be placed on board each Trolley for the collection of non-perishable food... more

’Tis the Season concert to feature local artists; benefit local charities

Tuesday, November 21, 2017

Following tradition, the sixth annual ’Tis the Season concert will feature local artists who hope to benefit local nonprofit organizations this holiday season. The concert, held at Ignition Music Garage (120 E. Washington St.) Saturday, December 2, is part of a celebration presented by the City... more

Upcoming Events All »

Board of Public Works & Safety & Stormwater

Monday, November 27, 2017, 2:00pm

Shade Tree Board meeting

Monday, November 27, 2017, 7:00pm

Goshen Housing Authority Board meeting

Tuesday, November 28, 2017, 7:00am

Wastewater

img

The Wastewater Treatment Plant was established in 1936. To date, it has gone through several updates to facilitate the growing population and businesses. Currently the design flow is 5.0 MGD (million gallons daily). The peak flow capacity is 12.5MGD. The primary treatment is to remove grease, grit, and to screen out debris. Our secondary treatment is done with aeration to remove phosphorus and ammonia. From April 1st to October 31st we disinfect with sodium hypochlorite (Bleach) to remove ecoli. The water is then treated with sodium bisulfite to de-cholorinate before being discharged to the Elkhart River. 

During rain events, the plant can reach its 12.5MGD, Before 2011 there were many CSO (Combined Sewer Overflow) sites throughout Goshen that would dump the excess into the Elkhart River. Since 2011, Goshen has built a Wet Weather Detention Facility to capture the extra water from rain events. To learn more about CSOs, please click here.

Ordinance 4625 - Pretreatment Requirements and Standards

To learn about the Wet Weather Detention Facility, click here.

To see the wastewater staff, click here.

To learn about lift stations and things to keep out of our sewer systems, click here.
 

The wastewater treatment plant has a SCADA (supervisory control and data acquisition) system. The SCADA system controls and monitors the plant 24 hours a day, 365 days a year. The SCADA system also has alarming capabilities that send alarms to the correct people to notify them if something is wrong with either of the plants as well as any of the 38 lift stations.  